Aqua Utopia|海の底で記憶を紡ぐ
Cosmic Funnies
$LAYYYTER

❣ Chile in a Photography ❣
Game of Thrones Daily
let's talk about Bridgerton tea, my ask is open

shark vs the universe

祝日 / Permanent Vacation

#extradirty
Three Goblin Art

roma★

Origami Around
Stranger Things
Sade Olutola

titsay
Alisa U Zemlji Chuda
taylor price
Cosimo Galluzzi
AnasAbdin
Lint Roller? I Barely Know Her

seen from Indonesia

seen from Australia

seen from United States
seen from Germany
seen from Brazil
seen from T1

seen from Malaysia
seen from Malaysia
seen from Netherlands

seen from Italy
seen from United States

seen from United Kingdom
seen from United States
seen from Switzerland
seen from Belgium

seen from Malaysia

seen from T1

seen from Malaysia
seen from Germany

seen from Malaysia
@loscharlitos

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
"We'll have someone else take over procurement, it's not a big deal, how hard could it be?"
My old job is now split between three people, all of whom are struggling with some aspect or another of it.
Person one: Wow, it's really difficult to get the techs to tell me what the hell these orders are for, and it takes a ton of time to reconcile purchases and charges because our system changes the numbers in a way that makes it hard to search so I have to go back and compare receipts and dates and reverse engineer every order made outside of the procurement department.
Person two: I'm having trouble billing for hardware in the same month we purchase it because we don't bill until the hardware ships and it's hard to get the techs to tell me when things have arrived and the vendors are really inconsistent about when they ship so I have to follow up on every order manually.
Person three: There are a lot of orders coming in so I'm scrambling to keep up with them and it's really hard to pay attention to detail because there's a bunch of stuff going on so I accidentally quoted hardware that doesn't match the client's needs and I don't know how to fix it and stay in the budget I laid out in the quote.
Me: Yeah that sounds terrible. ANYWAY!
Two of these people are totally nontechnical, and the third is technical but not the proper flavor of insane.
Did you know that Intel has a Core processor line and a Core Ultra processor line and that that if you order a Core 7 170U Processor it will have much worse performance than a Core Ultra 7 220H processor but when you're looking at most sellers online the only difference between those two is one word that's pretty easy to skip past when you're pressed for time?

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
always funny to remember darth vader is anakin skywalker. the adrenaline junkie chucklefuck who used to dive head first out of speeders and built a pod racer in his yard when he was like six is now upper-middle management for the evil empire. half of his appearances in the original trilogy are Meetings. vader spends like 80% of his time dealing with bureaucratic bullshit. status updates. team meetings. holo-Zooms. budget rundowns. anakin betrayed the jedi and caused the fall of the republic and his punishment is being CC'd on every email forever. and you know what. he would hate that. the punishment fits the criminal
BREAKING THIS MORNING: THE GUARDIAN AND NOAA JUST MAPPED THE MOST ALARMING FACT IN THE ENTIRE DATA CENTER STORY — 517 OF THE 809 PLANNED FACILITIES ARE BEING BUILT ON LAND THAT IS ALREADY IN DROUGHT
This story was published TODAY — June 8, 2026 — just hours ago.
The Guardian. Working with NOAA — the National Oceanic and Atmospheric Administration. The official government agency that tracks America’s weather and drought conditions. They mapped every single planned data center in the United States. All 809 of them.
And then they overlaid that map with NOAA’s official drought data.
The result is the single most alarming visual in the entire history of the data center crisis. And it proves — with government data, mapped by one of the world’s most respected newspapers — what every community in this series has been experiencing in their wells, their rivers, their reservoirs, and their fields.
Big Tech is deliberately building its water-hungry AI infrastructure in the places that have the least water to spare.
THE NUMBERS THAT WILL BREAK YOUR HEART
About two-thirds of the 809 data centers planned across the U.S. are slated for land that has been in drought over the past year, an analysis from The Guardian found — published today. The research found that 517 data centers are set to be built in areas classified as drought-stricken in the last year, according to NOAA’s National Integrated Drought Information System.
517 out of 809. That is not a coincidence. That is not bad planning. That is a deliberate industry pattern — and the evidence has now been mapped from official government drought data for everyone to see.
A Bloomberg analysis confirmed the same pattern: more than two-thirds of new data centers built since 2022 are located in water-stressed regions — places where people are already struggling to access clean water. These aren’t isolated sites. Approximately 160 new AI-focused data centers have been built in the U.S. over the past three years — a 70% increase from the previous three-year period. “The problem has only deepened in the years since ChatGPT kicked off an AI frenzy,” Bloomberg reported. 
70% more data centers. In three years. 70% of them in drought zones. While America’s aquifers recede, its rivers run lower, and families in Indiana find their wells have gone dry.
ALABAMA: ONE DATA CENTER WOULD DRINK TWO-THIRDS OF A CITY’S WATER
Here is the story that makes this abstract map suddenly, viscerally real.
In Bessemer, Alabama — a majority-Black community with a median household income well below the national average — community opposition temporarily halted construction of a data center that was projected to require 2 million gallons of water per day. That is roughly enough to supply two-thirds of Bessemer’s entire population. One data center. Two-thirds of a city’s daily water. Gone.
One building. Consuming enough water for two-thirds of a city. In a community that is already in a drought zone.
And in California — the state most associated with water crises in America:
Roughly 82% of data centers in California are located in communities already suffering from poor air quality — many situated in neighborhoods with particularly high levels of diesel pollution from the backup generators that run the facilities around the clock.
82%. In California. In communities already choking on diesel exhaust. Being chosen specifically for data center development.
WHY ARE THEY DELIBERATELY CHOOSING DROUGHT ZONES?
This is the question The Guardian investigation answers — and the answer is enraging.
Two-thirds of all data centers built or in development since 2022 are located in water-stressed areas like southern Arizona, the Colorado River Basin, and Texas — the driest, most vulnerable regions in America. The reason is economics: these areas offer cheap land, cheap electricity, and business-friendly regulations that have not yet caught up to the reality of what data center water consumption means at scale for communities already stretched thin.
Cheap land. Cheap electricity. Weak regulations. That is why they choose drought zones. Not because the water is abundant. Because the laws are weak, and the land is cheap, and the communities are poor enough that opposition is less organized.
In The Dalles, Oregon — a small town that became a cautionary tale — Google’s water use grew 316% while the town’s population grew just 12%. The math of data center water consumption in small, drought-prone communities is not sustainable. And yet the industry keeps choosing them — because they have the cheapest power and the weakest oversight.
316%. Google’s water consumption. 12%. The town’s population growth. In Oregon. Which is already dealing with drought. And which was chosen because it had cheap hydroelectric power.
THE COLORADO RIVER IS ALREADY DYING — AND THEY’RE BUILDING MORE DATA CENTERS ON IT
The Colorado River — the lifeline of the American West, serving 40 million people across seven states and providing irrigation for the farms that grow much of America’s food — is already so depleted that Lake Mead and Lake Powell have hit record lows in recent years. And data centers are being built throughout the Colorado River Basin — in Arizona, Nevada, Utah, and Colorado — all drawing on the same water system that is already in crisis.
40 million people. Seven states. One river. Already dying. And 517 planned data centers are going into the drought zones that include its basin.
The communities that have been fighting these facilities — in Utah, in Arizona, in Nevada — are not being alarmist. They are looking at the same NOAA drought maps that The Guardian published today. And they are saying: there is no water to spare. And the companies building these facilities know it — and are building there anyway, because the regulations haven’t caught up.
AND THE MORATORIUMS ARE SPREADING FASTER THAN EVER
The Guardian report landed this morning, and it is already accelerating the national movement.
In just the last two weeks — communities across America have enacted moratoriums at an unprecedented pace: Cedar Hill, Tennessee — two-year moratorium; McMinnville, Tennessee — 18-month moratorium; Ashwaubenon, Wisconsin — 12-month moratorium on hyperscale facilities; Augusta, Georgia — 49-day moratorium to update a 1963 zoning plan; Filer Township, Michigan — one-year precautionary moratorium; Daviess County, Kentucky — one-year moratorium; Merrillville, Indiana — one-year moratorium; Hillsborough, North Carolina — 60-day moratorium.
Eight communities. In two weeks. From Tennessee to Wisconsin to Georgia to Michigan to Kentucky to Indiana to North Carolina.
And in November 2026 — just five months away:
Voters in California, Michigan, Nevada, and Wisconsin will decide on at least five local ballot measures related to data centers — the first time in American history that data center construction has appeared directly on voter ballots. Americans will be able to vote — directly — on whether data centers should be allowed in their communities. The data center fight has officially entered the ballot box.
The ballot box. Five measures. Four states. November 2026.
After everything that has happened — the dry wells, the spiked bills, the shell companies, the workers killed, the Indigenous land threatened, the children harmed, the wildlife destroyed, the Nasdaq crash, the grid breaking — Americans are going to vote directly on data centers for the first time in history.
THE BOTTOM LINE
TODAY — June 8, 2026 — The Guardian and NOAA published the map that proves it all.
517 out of 809 planned data centers. Two-thirds. Being built on land that is already in drought. Measured by the official U.S. government weather agency. Mapped by one of the world’s most trusted newspapers.
They are not choosing these locations despite the drought. They are choosing them because of the cheap land and weak regulations that come with communities that haven’t yet figured out what is about to be taken from them.
Bessemer, Alabama. One data center. Two-thirds of a city’s water. Per day.
The Dalles, Oregon. Google’s water use up 316%. The town’s population up 12%.
The Colorado River. 40 million people. Seven states. Being drained from every direction.
517 more planned. In drought zones. Right now. Waiting for permits. Some with shell company names nobody has heard of yet.
But in November — for the first time — Americans in California, Michigan, Nevada, and Wisconsin will get to vote directly on whether to allow them.
And if the story of Festus, Missouri is any guide — if the story of Northern Virginia is any guide — if the story of the thousand people in Utah who chanted “Shame” is any guide:
When Americans actually get to vote on this? They vote no.
Share this TODAY. Share it everywhere. Because the map is out. The data is official. And November is coming.
Follow for more data center updates
Source: Tom’s Hardware — “Most new U.S. AI data centers are being built in drought zones — two-thirds of 809 planned projects set for areas with water shortages” (June 8, 2026 — TODAY) See less
See less
Highly Informative, pretty bad news....did you know they are using jet engines to power the data centers ? So far almost 100 at one site. And forget about any peace and quiet, or clean air if you live within 10 miles of them. 🙏
Note that this is being exposed by the media and part of our scientific legacy(NOAA) that are under attack by the administration.
Always remember that the EU did a study in 2013 about the effects of piracy on media publishers and found that there is no correlation between piracy and sales! (And then they tried to hide that study bc that's not the result they wanted)
So piracy is at worst not even a problem, and at best it's free advertisement.
Source: (the link to the actual study is in the article)
In 2013, the European Commission ordered a €360,000 ($430,000) study on how piracy affects sales of music, books, movies and games in the EU
the only true ally

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
June 1, 2026 - Hundreds of young Kenyans are protesting U.S. plans to send Americans who have been exposed to Ebola to a quarantine center in their country. There are no reported cases of Ebola in Kenya yet. [video]
Phillip Light
Lake-Side Gallery
My region has precious metal-packed data centers popping up all over the place like mushrooms and yet someone decided to steal all the copper out of the AC units at my community college library.

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
penthouse november 2003