The Tool Tower is in place, loaded and working!
I still need to decide what I’m doing with the other two shelves I have for it, but having the main level operational has really been a boon to the workflow and overall positive vibes of the shop.
Next step is to remove the Hossfeld bender and put it in long-term storage in the corner. Then I’ll move the yellow shelves down a foot or so to free up some room on the other end where I hope the Kerlin will sit. And, of course, I’ll need to do something to organize the shelves on the far wall because they’ve become a tangled mess of stuff on top of stuff.
Lots of little steps, but it’ll all come together sooner or later here at Three Rivers Forge. It’s a blacksmith’s life!












