My kinda train.
🏳️🌈🚄🚃🚃🚃

seen from Germany
seen from Peru

seen from United States
seen from United States
seen from Norway

seen from United States
seen from United States

seen from Russia

seen from Colombia

seen from South Korea
seen from United States
seen from United States

seen from United States
seen from Brazil

seen from United States

seen from Germany
seen from United Arab Emirates
seen from China

seen from Norway
seen from Palestinian Territories
My kinda train.
🏳️🌈🚄🚃🚃🚃

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
Part 13 in shipping different railway companies together.
C2C is alone. She does not want to be alone but that point gets misunderstood by the other folk. C2C is asexual but romantic and still wants to find that special someone but she generally doesn't get out there that much and doesn't really know anyone.
She has been acquainted to her neighbours, Greater Anglia whom she sees as obnoxious and slow, Elizabeth Line whom she doesn't know very well and London Overground, whom she is probably closest but if you think she desires a relationship with her, you are Barking up the wrong tree.
C2C probably was best understood by the Metropolitan District Railway, who is long since gone.
Crossrail Place || Canary Wharf || London {Explore 221, 2024/2/10} by Flickr
Crossrail Place, Canary Wharf
CrossRail Chicago is the key to improving passenger rail throughout America, and now is the time to make it happen! Sign the petition!
Dear Congress,
Please work to fully fund the Federal Railroad Administration so that critical projects like CrossRail Chicago can be built.
Fast, frequent, and affordable trains will give us better access to opportunities and lead to more prosperous regions. Americans will have increased freedom to travel, and the efficiency of trains will slash air, noise, and water pollution in the process.
CrossRail Chicago is a practical and affordable way to build the essential core of our nation’s railroad network. It will upgrade and connect several existing rail corridors to create electrified, high-capacity routes into and through Chicago. It will also expand Chicago Union Station as the hub of the nation’s passenger rail network. CrossRail can expand service to hundreds of cities and towns across the country.
Like many other rail projects, CrossRail benefits many states and requires a strong federal program to achieve success.
Please ensure that Americans have access to safe, convenient, and affordable travel by fully funding our federal rail program through the Federal Railroad Administration.
Click here to learn more about CrossRail Chicago

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
3rd train of the Elizabeth line's revenue service
North Woolwich Crossrail portal, E16
Kingsway Tram Subway
Back in the early days of this blog (Autumn 2016), I wrote about the underground tramway that ran the length of Kingsway, with the only above-ground remnant being the ramp down to the tunnels at its northern end, near to Holborn tube station. At the time, I didn’t know much about this piece of transport history; in the intervening years, I came to know a little more, and wished that I could go down into the tunnel to see the remains of the track and station. Then, in 2021, the opportunity arose, courtesy of London Transport Museum’s ‘Hidden London’ Tours…
Trams had arrived in London in the 19th Century, with extensive networks developing both north and south of the river. And here was the problem: the northern and southern networks were still separate at the turn of the 20th Century. At this time though, the slums between Covent Garden and Lincoln’s Inn Fields were being swept away to allow construction of the new streets of Kingsway and Aldwych – and plans were made to lay below them a tram subway to connect the two already existing tram systems.
The subway was built for single-decker trams to run underground from Southampton Row (just north of Kingsway) all the way through to the Victoria Embankment at Waterloo Bridge, where they would emerge and continue towards Westminster Bridge to cross the river. There were two stations within the subway, Holborn and Aldwych, which were accessed by entrances built into traffic islands at either end of Kingsway.
The subway opened for services in 1906, although initially they could only use the northern entrance, and would terminate at Aldwych before reversing. Through services began to operate in 1908, following completion of the southern subway entrance. However, by 1929, it was realised that running single-decker services was not profitable, and so the decision was taken to convert the tunnel to accommodate double-decker trams. Through a combination of raising roofs in some places, and digging deeper in others, the subway was ready for the taller trams by 1931.
It was not long after this though that London Transport began to replace trams with more “modern” forms of transport; by 1940, nearly all trams had been replaced by trolleybuses, except for some South London routes, and those that used the tram subway. The Second World War stalled the replacement scheme, but this reprieve would only last until 1952, when despite their popularity, the last trams using the subway were withdrawn from service.
In 1964, the southern section of the subway was converted to be the road underpass from Waterloo Bridge to Aldwych that still exists to this day. Meanwhile, the northern end of the tunnel was given to Camden Council to use as storage (they mostly seem to be using it for bricks and litter bins!).
And so this section of the subway remained as such for many years, with the occasional appearance in films, and even being home to an art installation from 2008-9. In 2012, the Crossrail tunnel contractor began using the tunnel to dig a shaft to stabilise the ground for the arrival of tunnel boring equipment; the hole has since been filled in and the tunnel restored to its former condition, allowing (at last!) for tours to visit this unique place.