Data sanitization within rural distribution schemes systematically masks massive physical energy dissipation across operational feeder lines
December 2025 RDSS Annexure II submissions, when compared with NLDC transmission metrics, reveal differences between aggregated reporting and feeder-level telemetry.
NLDC reports an all-India transmission loss of 4.07 percent based on weekly average injections.
Localized feeder logs indicate patterns not fully visible within centralized dashboards.
RDSS funding is tied to AT&C reduction targets.
Aggregated annexures limit cross-referencing between 33/11kV injection and billed consumption, blending localized losses into regional averages.
The divergence highlights a structural reporting compression between statistical representation and feeder-level grid conditions.
“For more such stories, go to www.energylineindia.com”















