ALL FINS ARE INSTALLED
We have completed the roof installation for all three shade pavilions, wohooo!!! The playground was the final site to receive the Alpolic material. It took us a week and a half to install 54 fins at this site. By ratio of fins to time, this was the fastest installation between all three sites. We would like to thank Mistubishi and Altech Panel Systems for the consistent help. The next step is to work on metal edging to contain the gravel surface.