The Alkek 2020 Vision
By: Alison Quisenberry April 3, 2019
Texas State students are no strangers to seeing construction projects all around them. Along with the LBJ Student Center, Alkek Library is undergoing some major changes.
The Alkek construction project may seem an inconvenience now, but the $14.3 million project will add some much needed upgrades to the student library. The first, second, fourth and seventh levels are all being renovated. The first floor will be technology central, including virtual reality and digital design centers, 3D printers and an Omni-globe, which will be used for research to map worldwide events, simulating weather patterns and viewing ocean currents. YouStar Studios and a Creative Manufacturing Center will also be found on the first floor.
Texas State junior Gavin Magee said the renovations should bring Texas State technology into the 21st century.
The second floor will include a Starbucks, which will be the coffee chain's third location on campus. The fourth floor will remain home to the SLAC tutoring labs and also include a Graduate Commons. The new area for graduate students will have study spaces, a lounge area and lockers. “Graduate students finally have a place to call their own,” said Isabel Valdez, an exercise and sports science graduate student.















