Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
ā Live Streamingā Interactive Chatā Private Showsā HD Qualityā Free Actions
Free to watch ⢠No registration required ⢠HD streaming
Raleigh, NC to Dallas, TX and Back: 2,642 miles with a (free) Zero FXS in tow
I have a friend who co-signed for a 2016 Zero FXS back when the bike was new. The owner said the drive belt kept fraying due to a manufacturing defect (a bad weld, he claims). While fighting Zero about this, the dealership he bought the bike from dropped the brand. The next closest dealer was about 70 miles away, and he had no way to get it there. Defeated, he plugged it in one last time, covered it up, and forgot about it. Fast forward two years, he wants it gone. My buddy who co-signed reached out to me and said,Ā āif you want it, come get it.āĀ
Iād been saying for a while it is a shame that you have to not only have your motorcycle endorsement but you must have had it for more than a year in order to rest ride bikes at our local dealerships. There are many people who would plop down money (no license needed to buy, of course) if they only had the opportunity to experience the sheer joy of an electric motorcycle. I now had an opportunity to bring this dream to reality: every Drive Electric and Earth Day event could offer test rides on this Zero. I sincerely believe if more people got the change to ride an electric motorcycle, theyād want to own one.Ā
Quick Trip Stats
Raleigh -> Dallas
Miles: 1,280
DC Charge Stops: 16
Level 2 Charge Stops: 2
Cost: $135.04
Energy Consumed: 283.46 kWh
Travel Time: About 36 hours non-stop
Dallas -> RaleighĀ
Miles: 1,362
DC Charge Stops: 15
Level 2 Charge Stops: 2
Cost: $141.29
Energy Consumed: 303.15 kWh
Travel Time: Broken into two days, vehicle reports 32h 31m driving time.
Totals
Miles: 2642
DC Charge Stops: 31
Level 2 Charge Stops: 4
Cost: $276.33
Energy Consumed: 586.61 kWh
Getting to Dallas
This was the first time I was going to take the trailer on a truly long journey. I decided it best to play safe and charge to 95% at every stop, just because I didnāt know what to expect or if I could even make this trip.
I pulled out of my driveway a little past 11am, an hour ahead of schedule. I planned to goĀ āstraight 40ā³ as much as I can -- that is, Iām not trusting the one expensive Tritum-built ChargePoint station in Lenoir. Iāll go south to Boiling Springs SC and then up 26 to Asheville and catch 40 from there. My goal was get there as fast as I can, so I used the three big networks and a Nissan dealer to get me there. See blow for the geeky detail:
Asheboro
Network: ChargePoint
Charger Power: 50kW
Duration: 27min
Energy Delivered: 17.77 kWh
Cost: $4.80
Notes: Nothing special to report, picked up lunch at the McDonaldās and hit the road.
Charlotte
Network: Electrify America
Charger Power: 150kW
Duration 1: 14min
Energy Delivered: 11.52 kWh
Cost: $5.02
Duration 2: 13min
Energy Delivered: 6.29 kWh
Cost: $4.41
Total time: 27 minĀ
Total Cost: $9.43
Notes: The first session faulted and I had to move locations. I also had to disconnect the trailer at this location due to the amount of traffic and time of day that I was charging.
Boiling Springs
Network: EVgo
Charger Power: 50kW
Duration: 31min
Energy Delivered: 16.7 kWh
Cost: $11.24
Notes: This location was easy toĀ āswing inā to charge and not have to unhook the trailer.
Asheville
Network: EVgo
Charger Power: 50kW
Duration: 29min
Energy Delivered: 17.48 kWh
Cost: $8.99
Notes: e-Tron was using the station I could have pulled up to without unhitching the trailer. I unhitched and moved the trailer into the parking space to the left of the car. Security came by and told me I had to move the trailer because itās in the police parking space, I argued with the guy and finally moved it. His superior came out moments later and apologized, saying that it clearly isnāt an issue since youāre sitting with the vehicle and could move it if needed. It is on my to-do list to contact the mall to have that space reclassified as EV only, citing my use case and experience as justification.
Ā
Dandridge
Network: EVgo
Charger Power: 50kW
Duration: 9min
Energy Delivered: 5.11 kWhĀ Ā
Cost: $3.07
Notes: This stop was to add just enough to get me to Knoxville.
Ā
Knoxville
Network: Electrify America
Charger Power: 150kW
Duration: 21min
Energy Delivered: 24.35 kWhĀ Ā
Cost: $11.79
Notes: No issues at this location
Ā
Cookeville
Network: Electrify America
Charger Power: 150kW
Duration: 33min
Energy Delivered: 25.26 kWh
Cost: $12.81
Notes: Arrived with 5% SOC and charged to full
Ā
Nashville
Network: Electrify America
Charger Power: 150kW
Duration: 9min
Energy Delivered: 9.26kWh
Cost: $3.42
Notes: Realized it was closer to get to Dickson from Franklin, so ended charge and drove to Franklin.
Ā
Franklin
Network: Electrify America
Charger Power: 150kW
Duration: 19min
Energy Delivered: 13.91 kWh
Cost: $7.27
Notes: Full charge, arrived with 47% SOC. From here to Jackson is the single longest leg of the trip and canāt be done w/out a Level 2 stop.
Duration: over an hour
Energy Delivered: ????
Cost: FREE
Notes: I arrived at 4:30am and there is a Waffle House next door thatās open 24/7. I was able to grab a bite to eat while the car did its thing.
Ā
Jackson
Network: Electrify America
Charger Power: 150kW
Duration: 25min
Energy Delivered: 22.56 kWh
Cost: $9.55
Notes: This was the first site to give me trouble getting started. The first two machines I tried didnāt detect the car or gave a charge start error. The third station was the charm.
Germantown
Network: Electrify America
Charger Power: 150kW
Duration: 17min
Energy Delivered: 15.20 kWh
Cost: $6.44
Notes: This location has one station thatās easy to swing into with a trailer. Itās also across the street (easy to cross) from IHOP and next to the Best Buy that gave me my first ever job as a teenager.
Ā
Forrest City
Network: Electrify America
Charger Power: 150kW
Duration: 23min
Energy Delivered: 18.21 kWh
Cost: $8.62
Notes: Nothing to report at this location, other than running 55mph on this stretch of 40 can be a little scary during the day time when you canāt really run your flashers.
Dub'l R RV Park
Network: None / NEMA 14-50 (bring your own EVSE)
Charger Power: 50A (3kW TurboCord used)
Duration: 1.5 hours
Energy Delivered: ????
Cost: $22 day rental of RV spot (not reflected in charging cost as I consider this lodging)
Notes: I was nervous I couldnāt make it from Forrest City to Little Rock - an unfounded fear it turned out - so I booked a day rental at an RV park knowing I could use my 3kW portable Level 2 charger to top off the car. When I got to the RV park, I had more than enough energy to get to Little Rock... but Iād already paid and it wasnāt refundable, so I plugged in for an hour and a half and caught a quick nap.Ā
Ā Ā
Little Rock
Network: Electrify America
Charger Power: 150kW
Duration: 29min
Energy Delivered: 23.57 kWh
Cost: $10.70
Notes: This was the third longest leg of the trip and didnāt involve a Level 2 stop.
Ā
Hope
Network: Electrify America
Charger Power: 150kW
Duration 1: 6min
Energy Delivered: 3.38 kWh
Cost: $2.20
Duration 2: 29min
Energy Delivered: 20.60 kWh
Cost: $11.26
Total Time: 35min
Total Cost: 13.46
Notes: First station was only putting out 35kW, had to move to another station to get the 60+kW charge rate I should be getting.
Mt. Pleasant
Network: Electrify America
Charger Power: 150kW
Duration: 26min
Energy Delivered: 21.96 kWh
Cost: $9.68
Notes: So ready to be done with this trip....
Royse City
Network: Electrify America
Charger Power: 150kW
Duration: 10min
Energy Delivered: 10.29 kWh
Cost: $3.77
Notes: charged just enough to make it to Dallas.
Iād been teasing folks on social media about the trip, and finally revealed the reason for the trip once I got to Texas about 10:30pm: A free Zero FXS motorcycle.
Return to Raleigh via Chattanooga
All good things must come to an end, and sometimes they end sooner than expected. Thanks to hurricane season, I had to depart Texas on Wednesday evening instead of Friday as Iād planned. The flash flood and wind advisories starting Thursday meant that if I didnāt leave now, I might not be able to -- Iām not a fool and Iām not going to mislead you. Any amount of windĀ could leave me stranded on this, Iām pushing the car to its limits and truly putting blind faith in the concept that this will work. It paid off, even if I managed to get something in my eye / allergic reaction that gave me a puffy and watery eye the entire way home.
I was not only pulling a motorcycle on a trailer, I also had two electric assist bicycles packed in the car. This was a very EV-centric trip! The bicycles were being moved for my friend, who is relocating to NC from TX.
Speaking of motorcycle on trailer. Many asked if it fell over or why it was on its side. Answer: coefficient drag. Standing the bike up, it is like adding a parachute to the back of the car. If I laid it down on its side, it is below the roofline of the car and thus adds no impactful drag to the vehicle. The only impact it has on range is its added weight, which Iām going to say that I weight more than the motorcycle and the two eBikes were less than half the motorcycles weight. Effectively, I had the car loaded up with 2.5 versions of myself, which is why I got the 4.0mi/kWh average efficiency that I got.
This trip I planned to leverage Electrify America exclusively, mostly for the charging speed but also to prove beyond a shadow of a doubt that the network isĀ dependable and can be relied on for long trips like this.
Royse City
Network: Electrify America
Charger Power: 150kW
Duration: 21min
Energy Delivered: 15.12 kWh
Cost: $7.86
Mt. Pleasant
Network: Electrify America
Charger Power: 150kW
Duration: 37min
Energy Delivered: 25.40 kWh
Cost: $14.16
Hope
Network: Electrify America
Charger Power: 150kW
Duration: 10min
Energy Delivered: 10.34 kWh
Cost: $3.85
Duration: 16min
Energy Delivered: 11.12 kWh
Cost: $6.27
Total Duration: 26min
Total Cost: $10.12
Notes: History repeats itself... station faulted and had to move to another station. Was not sure I could make it to Little Rock, decided to detour to Benton for a Level 2. An Electrify America Haiku was created.
Benton
Network: Electrify America
Charger Power: 150kW
Duration: 31min
Energy Delivered: 24.97 kWh
Cost: $11.72
Notes: Nissan dealer locked their gates so I had to back track to the Fairfield Inn to get a charge, luckily no one was using the stations and I was able to pull right up w/out disconnecting the trailer.
Little Rock
Network: Electrify America
Charger Power: 150kW
Duration: 31min
Energy Delivered: 24.97 kWh
Cost: $11.72
Notes: Had to take the service road, but I made it! Wind was starting to kick up from the incoming storms.
Forrest City
Network: Electrify America
Charger Power: 150kW
Duration: 28min
Energy Delivered: 24.06 kWh
Cost: $10.36
Notes: With exception of Jackson - Franklin, this was the last long stretch I had to worry about. All future legs will be less than 90mi apart, well within the cars range with the added load.
Germantown
Network: Electrify America
Charger Power: 150kW
Duration: 18min
Energy Delivered: 16.07 kWh
Cost: $6.94
Jackson
Network: Electrify America
Charger Power: 150kW
Duration: 24min
Energy Delivered: 19.37 kWh
Cost: $9.41
Dickson
Network: Local Power Cooperative
Charger Power: 7kW
Duration: about 45 minutes?
Energy Delivered: ??? kWh
Cost: FREE
Notes: A guy with a CRV that had a make shift front bumper and was also pulling a trailer came over and asked me lots of questions. He was considering a Bolt and knew that towing was possible but so few had done it he didnāt know what the efficiency hit might be like. It was the best conversation that Iād had the whole trip, actually it was the only one.
Franklin
Network: Electrify America
Charger Power: 150kW
Duration: 30min
Energy Delivered: 24.93 kWh
Cost: $11.63
Notes: Arrived with 5% SOC, one more stop before my overnight in Chattanooga.
Manchester
Network: Electrify America
Charger Power: 150kW
Duration: 22min
Energy Delivered: 17.33 kWh
Cost: $8.57
Notes: Iām soooo ready for this trip to be over. My eyes are killing me (at this point definitely thinking this is an allergic reaction to a pollen Iām not used to anymore), and I just wanna crash.
Chattanooga - overnight
Notes: I stayed with fellow Energica motorcycle (and former Zero motorcycle) owner Tyler, a good buddy of mine. He let me recharge using his home charger, so I guess that is technically the third Level 2 of this leg but I donāt consider overnight charges to be a part of the travel time per se. Mostly because I needed to sleep, so thereās noĀ āwaitingā on the car per se. You can take that how you will, not trying to fudge numbers. I didnāt leave till almost sunset the next day, which meant that Iād end up changing plans.
Iād intended to make this a three day jaunt home, and spend Friday night in Columbia. Instead, due to weather and my own tiredness, I decided it best to just go straight home. By the time Iād get to Greenville - necessary to get to Columbia - Iām just two charge stops from home (Charlotte and Greensboro), so I decided to plow on to home.
Kennesaw
Network: Electrify America
Charger Power: 150kW
Duration 1: 21min
Energy Delivered: 21.42 kWh
Cost: $7.42
Duration 2: 9min
Energy Delivered: 3.30 kWh
Cost: $1.40
Total Duration: 30min
Total Energy Delivered: 24.72
Total Cost: $8.82
Notes: The station cut off at 82% for no reason, I moved to the next station over to finish up my charge. Someone came by and took my picture at this location, and later posted it to a FB group as a comment on my thread about this adventure.
Commerce
Network: Electrify America
Charger Power: 150kW
Duration 1: 8min
Energy Delivered: 5.62 kWh
Cost: $2.95
Duration 2: 19min
Energy Delivered: 13.25 kWh
Cost: $6.54
Total Duration: 27min
Total Energy Delivered: 18.87
Total Cost: $9.49
Notes: I donāt remember if it faulted or was just going slow, but I had to switch stations here.
Greenville
Network: Electrify America
Charger Power: 150kW
Duration: 31min
Energy Delivered: 24.17 kWh
Cost: $11.56
Notes: Charged to 90%, decided to verify that Greer/BMW Performance Center ChargePoint 24kW DC fast was operational (recent PlugShare check in but PlugShare score was still low).Ā
Greer
Network: ChargePointĀ
Charger Power: 24kW
Duration: 7min
Energy Delivered: 2.60 kWh
Cost: FREE
Notes: Station does work! I had a hard time finding it and was almost taken out by a semi truck leaving the facility... Security came and talked with me, they wanted to make sure I was OK and also it was just weird to see a vehicle with a trailer that late at night.Ā
Charlotte
Network: Electrify America
Charger Power: 150kW
Duration: 29min
Energy Delivered: 22.79 kWh
Cost: $9.99
Notes: Being 5:30am there was no one to block traffic for, so I just pulled up next to the machine and blocked the whole lane.... I was over it, I wonāt lie.
Greensboro
Network: Electrify America
Charger Power: 150kW
Duration: 30min
Energy Delivered: 21.29 kWh
Cost: $10.66
Notes: The last charge stop... so happy to get here, but it also invalidated something I said / an argument I was holding online. See some time ago I made a post on a FB group of me charging the car while pulling the Energica and I got a lot of flack forĀ āblocking all the stationsā ...
Needless to say, when I posted to this group about making it to Chattanooga I made a point of calling out that Iād yet to come across a station in use or have someone roll up and wait on me... so how Iām parking doesnāt matter (at least right now).
WELL this location had to prove me wrong. I plugged into the CHAdeMO station because it was the one I got working the last time I was out here, and a Kia Soul EV pulled up as I was at 91% and had to wait 5 minutes for me to finish my charge and move. 5 minutes. Such anĀ āinconvenience.ā I digress...
Lessons Learned
Having a third wheel on the trailer tongue is a core requirement if you plan to tow with an EV. You will end up needing to disconnect the trailer to get into an Electrify America charging station, itās inevitable.
Running 55mph in a 70 (or 75mph as it was in Texas) zone is safe so long as youāve got your hazzards on. They are less effective in the day time, so I advise trying to do most of the travel at night. Bonus is night travel consumes much less AC in the south, so you go farther on a charge.
Any amount of wind can turn a 25 mile buffer into a 3 mile buffer, never cut a charge short becauseĀ āyouāve got this.ā You may not.
Donāt try and pull 30-hour trips non stop. Plan overnight breaks, plan long meal breaks, donāt do what I did... youāll regret it. I slept a solid 20 hours (not kidding) once I got home.Ā
A word on charging networks
Electrify America was clearly the dominant player in making this trip happen. I had some snags, but itās safe to say that the network - used in 6 states - was dependable. I donāt want to hearĀ āNon-Teslas canāt towā orĀ āElectrify America isnāt reliableā ever again because I just proved both wrong, and I got a free motorcycle out of it too.
Now... to figure out why this thing doesnāt have working lights or horn but will start and drive.