ืืืื ื ืืืืงืืช ืืืืฉืืจื ืื ืืื ืืืืคืก 4 ืืืฉืจ ืืื ืื ืืืช ืืืฉ, ืขืื ืืฉืื ืืจืืฉืื ืชืจื ืงืืืช ืืืชืจ ืืื ืืื, ืื ื ืืืืืืื ืืืชืงืฉืจ ืขื ืืืื ืืืืงื, ืืืืฆืืข ืืกืคืจ ืืืืงืืช ืืืืื ืืื ืืื ืืขื ืกืืืื. ืืืชื ืืืืงืืช ืื ืชื ืื ืืืจืื ืืงืืืช ืืืฉืืจ ืืืืืก โ ืืืคืก 4. ืชืคืงืืื ืฉื ืืืื ืืืืืงืืช ืืืจืฅ ืืฉื ื ืืกืคืจ ืืืื ื ืืืืงื ืืืงืจืช ืืืืืช ืืื ืืื. ืืขืืืืช ... ืงืจืื ืขืื
Testing institutes for building permits and form 4 When building a new house, during the licensing stage, the building permit was granted, We are obligated to communicate with a testing institute, to perform a number of tests during construction and until its completion. Eitan Tests are a necessary condition for obtaining a occupancy permit โ Form 4.
The role of the testing institute In Israel there are several testing institutes for controlling the quality of construction. Laboratories institutes perform various tests throughout all stages of house construction. These tests constitute confirmation of the quality of the materials and how they are installed and used in the structure. The tests are conducted according to the Israeli standard that requires construction. The quantity and type of inspections is determined during the licensing stage and is required in the requirements sheet of the Planning and Construction Committee. For different construction methods, there are different tests...











