๐ ๐๐ฒ๐ฎ๐ฑ๐ถ๐ป๐ด ๐๐ถ๐ฎ๐ฝ๐ต๐ฟ๐ฎ๐ด๐บ ๐ช๐ฎ๐น๐น ๐๐ผ๐ป๐๐ฟ๐ฎ๐ฐ๐๐ผ๐ฟ๐ | ๐๐ฎ๐บ๐ฎ๐ฟ ๐๐ป๐ณ๐ฟ๐ฎ๐๐๐ฟ๐๐ฐ๐๐๐ฟ๐ฒ ๐ฃ๐๐. ๐๐๐ฑ.
he Best form of retaining walls is the Diaphragm Wall system. Trench thickness from 400mm to 1500mm by 2500mm long. Trench depth up to 50 meters using 80-ton rig working capacity.
๐ข๐จ๐ฅ ๐ ๐๐๐๐ฆ๐ง๐ข๐ก๐
โฆ ๐๐ผ๐บ๐๐ถ ๐ฅ๐ถ๐๐ฒ๐ฟ ๐๐ฟ๐ผ๐ป๐ ๐ฃ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐ - ๐๐ฒ๐ฝ๐. ๐ข๐ณ ๐๐ฟ๐ฟ๐ถ๐ด๐ฎ๐๐ถ๐ผ๐ป - ๐๐๐ฐ๐ธ๐ป๐ผ๐, ๐จ.๐ฃ
โต Constructed 131 Numbers of the panel in 30 days which is a record in the construction industry utilizing 14000 cum of concrete and Cage Fabrication of 1250MT. ( with 4 Hydraulic Rigs )
โต In One and half years completing 1375 numbers of panels with 80000 cubic meters of concrete and cage fabrication of 14000 MT ( with 4 Hydraulic Rigs )
โฆ ๐๐ฎ๐ฟ๐๐ฒ๐ป & ๐ง๐ผ๐๐ฏ๐ฟ๐ผ ๐๐๐ฑ. ( ๐. ๐. ๐ฃ. ๐๐ฒ๐ฎ๐ฑ-๐ค๐๐ฎ๐ฟ๐๐ฒ๐ฟ๐, ๐๐ฒ๐น๐ต๐ถ )
Constructed 55 numbers of a panel in 30 days utilizing 3200 cubic meters of concrete and Cage Fabrication of 285MT ( with only one hydraulic Rig )
โฆ ๐ง๐ต๐ฒ ๐๐ผ๐ฑ๐ต๐ฎ ๐๐ฟ๐ผ๐๐ฝ, ๐ก๐ฒ๐ ๐๐๐ณ๐ณ๐ฒ ๐ฃ๐ฎ๐ฟ๐ฎ๐ฑ๐ฒ, ๐ช๐ฎ๐ฑ๐ฎ๐น๐ฎ - ๐ ๐๐บ๐ฏ๐ฎ๐ถ.
โต Constructed 200 numbers of the panel in 180 days utilizing 2000 cubic meter of concrete and Cage Fabrication of 175 MT ( with only two Hydraulic Rigs )
โฆ ๐๐ ๐ฅ๐, ๐ ๐ฎ๐ป๐ฑ๐ถ ๐๐ผ๐๐๐ฒ, ๐ก๐ฒ๐ ๐๐ฒ๐น๐ต๐ถ.
Constructed 125 numbers of a panel in 180 days utilizing 12500 cubic meters of concrete and Cage Fabrication of 1375 MT (with only One Hydraulic Rig)
for more details please visit us:
๐ฐ๐ฐ๐ฐ.๐ค๐๐ฆ๐๐ซ๐ญ๐จ๐จ๐ฅ๐ฌ.๐๐จ๐ฆ / ๐ฐ๐ฐ๐ฐ.๐๐ข๐๐ฉ๐ก๐ซ๐๐ ๐ฆ๐ฐ๐๐ฅ๐ฅ.๐ข๐ง
also, If have any interest or have any query, please write to us feel free on : [email protected]