Rating: 4.9 βββββ π‘ THE HOME BUILDING TIMELINE EXPLAINED π β¨ Dream β Design β Delivery πΉ 1) Pre-Construction (1β6 Months) π Set Goals & Budget π Pick A Location π Design & Permits π·ββοΈ Hire Builder πΉ 2) Site Prep & Foundation (1β3 Months) π§Ή Clear Land & βοΈ Excavation β‘ Install Utilities ποΈ Pour Foundation πΉ 3) Structure & Systems (3β6 Months) πͺ Framing ποΈ Exterior Works π Rough-ins πΉ 4) Interior to Move-In (3β6 Months) π§± Insulation & Drywall ποΈ Finishes βοΈ Final Inspection & Punch List π¦ Closing & Move-In π Save this post for later! π +91-98855 53600