Project 2
In groups of 6, we were required to choose a studio project done by one of the members and apply basic building services into the building such as:
1. Water supply system
2. ย Electrical supply system
3. Sewerage systems
4. Mechanical transportation system
5. Mechanical ventilation and air conditioning ย system
6. Fire protection system
Students are to document their studies onto an A4 sized report.
https://drive.google.com/file/d/0B8omUSMEAOhySTQ5V0hQQy1ObEU/view
















