Project 2
In groups of 6, we were required to choose a studio project done by one of the members and apply basic building services into the building such as:
1. Water supply system
2. Electrical supply system
3. Sewerage systems
4. Mechanical transportation system
5. Mechanical ventilation and air conditioning system
6. Fire protection system
Students are to document their studies onto an A4 sized report.
https://drive.google.com/file/d/0B8omUSMEAOhySTQ5V0hQQy1ObEU/view















