Ghost Town is an expert scenario that is a paid rides park. You start out with a medium sized empty park, the goal is to have 10 different types of roller coasters that are each 3,937ft long and at least 7 excitement. Considering the size of the park, and the fact that half of it is mountains, this goal is quite ambitious.
Since I knew building 10 large, exciting roller coasters would be no small, or cheap, task, I started by building a solid base of thrill rides. It also turns out that most of the guests had very low intensity and nausea tolerances as well. In the bottom right corner of the screen shot above, you can see I put a one way sign, keeping all the guests in the upper half of the park. I did this to eliminate the need to staff the lower half of the park until I started building rides there.
After spending half of Year 1 building the north end of the park, I moved down to the south end, and built that up with thrill rides to bring in additional guests and increase my income. I knew I would need at least $10,000 to build the first ride so I could use more guests in the park generating money. Towards the end of Year 1 guests start getting hungry and thirsty, and as you can see I built a strip of shops for them to access. I spent a few months researching shops because I did not have the Cash Machine, or more than two different drink stalls, however after a few months of no results, I went back to only researching Roller Coasters.
As you can see, I finished the first roller coaster halfway through Year 2, I was limited by how much money I had, and I did not want to have to take out a loan to pay for it. It is a fairly standard looking Wooden, I made the Station big enough to hold the maximum number of trains and cars, to help maximize the profit. Even though there was a minimum length requirement, I tried to keep the overall size of the ride down, to allow the other 9 roller coasters ample space. I think it was successful because the majority of the ride is very compact and in a corner of the park that would be hard to utilize. Since the excitement was so high, I could charge a lot for this ride, however I decided to charge $6. One reason I didn't charge more was because of the lack of Cash Machines in the park.
Guests really liked the Wooden coaster and it started generating tons of cash, which allowed me to get started on the second roller coaster. I chose to do a Floorless because it has become one of my favorite types. I had similar goals as the previous coaster, try and keep the overall size down, while still meeting the required ride length. I did this by having a very compact, but lengthy, helix section at the beginning. I also wanted to get more excitement from having proximity to the Wooden Coaster, so I have lots of track adjacent to it. My favorite part of this ride is the parallel corkscrews that go over the Wooden's track, I think it looks really cool.
I had researched a few good roller coasters during this time, all steel based, so I switched to researching shops again, hoping to get the Cash Machine. In June of Year 3, I finally did, and I put them everywhere. At this point, the Wooden roller coaster was making almost $10,000 per hour and the Floorless was making $20,000. The Floorless has the advantage of 3 trains over the Wooden's two, and had a little bit more excitement.
During this time I also took care of some upkeep problems, such as not enough shop and staff. The park was growing quickly because of the giant roller coasters, and keeping up with the increasing guests while still quickly building roller coasters became difficult. In between each new coaster I would check the paths and guest's thoughts to make sure the park was still in good condition.
The next roller coaster I built was the Vertical Drop, which is very similar to the Floorless. I had quite a bit of money at this point, and I decided to try and build it in the same area as the other two roller coasters, to help save space for the other 7 that I still needed to build. I tried to have as much adjacent track to gain excitement, as I wanted the only inversions to be the two loops after the first drop. This turned out to work out perfectly, as I went over the minimum length by quite a bit, which definitely helped me get the 9 excitement rating.
Using the remaining space on the flat side of the park, I built a Corkscrew Coaster. This one didn't work out as well as I expected. The intensity was really high, and the excitement was just over the minimum. This is most likely caused because of the number of inversions, I should of used more big drops instead of more inversions. The amount of adjacent track is ample, but clearly not enough to get a higher excitement. If I redid this, I probably would have big hills and big drops initially, and then some cork screws and helixes, rather than a combination of all of them throughout the whole ride.
The next ride I built was a hypercoaster. I have almost no experience building these, but I knew I'd have to have a huge lift hill and have a few good drops. The first two drops did a good job of this, and then I used helixes above the other roller coasters to build excitement while also having extra points for proximity to other pieces of track (this also helped increase the excitement on the Corkscrews Coaster).
Since I was running out of room in the flat area of the park, I decided to build the next roller coaster (number 6) underground. I prefer to use Mine Train rollercoasters underground because of their excellent helix abilities, and they seem to be more exciting on this ride than some others. Also higher lateral G's seem to be tolerated more. As you can see in the screenshot, there are a lot of helixes that are adjacent to help build excitement. The first drop goes into bunny hills that go all the way across the park, turn around, and come back to a second, very short, lift hill, and go into what you see on the screen. I was really expecting a higher excitement from this, because it is underground and a fairly long ride. While not my best Mine ride, it did pass the requirements for the scenario.
This Twister turned out almost exactly like I expected. I used many inversions to get the excitement up, but also used many helixes to meet the length requirement. The only cool thing about this ride is the first drop goes into a corkscrew that goes through a loop, other than that this is a pretty straight forward ride with inversions.
I usually avoid building Flying Turns (Bobsled Coaster in RCT1) because they are very difficult to do correctly. The single cars do not hold speed for very long, so you have to have excessively tall lift hills to make sure they make it back to the station. Luckily I had essentially unlimited money at this point, so I just build the ride above all the thrill rides at the north end of the park. It does feature a second lift hill halfway through the ride to make sure the cars make it all the way around, but other than that this is a pretty boring ride. While building it I ran into many problems with the Enterprises below, because they require a lot of vertical space, therefore I was not able to make large hills or drops like I wanted to. This resulted in mainly helixes, which was most likely the biggest reason why the excitement was just barely about 7.
About one month later, the Flying Turns ride crashed, so I shut it down for the remainder of the scenario. It did meet the requirements for the 10 roller coasters, however it was negatively impacting my park rating, so I kept it, but left it closed.
For the 9th coaster I built a Hyper Twister, which is basically just a normal steel style roller coaster. This had a very tall lift hill, which allowed me to have this ride above the Twister coaster and still have large drops (the air time is 7 seconds!). I used the helixes as long turn around pieces, so that the length would be above the required length, and on the way back to the station I had it go through the Twister's loop. I was really surprised that it worked, as there was already a corkscrew going through the loop. Now I know that two pieces of track can fit through a single loop, very cool.
Shortly after building the Hyper Twister, I received the award for Best Custom Designed Rides, pretty sweet!
I had one more roller coaster to build, nearly $100,000 and had almost half of the park to build it in. I decided to try a Giga Coaster.
I had a super duper huge lift hill, and had a few big hills at the beginning of the ride. Then several huge stacks of helixes, some turns on top of the other roller coasters, and then a short underground section with several helixes as the turn around area to get back to the station. I was really surprised with the excitement on this ride, because it really was a fairly simple ride. I'm sure it cost a fortune, but I had so much money I wasn't really paying attention. Also, having a length of 10,000 feet definitely helped.
Once I opened the Giga coaster I reopened the Flying Turns ride to win the scenario.
This scenario was a lot of fun, because I tried to keep all the roller coasters as compact as I could, which definitely helped their excitement to be higher, as well as gain more experience on how to build several coasters on top of each other. I think the final park looks really cool because of how much track is in such a small area.