This interactive flipbook was created with Publuu.com
THE BIG PROCESBOOK. FLIP TROUGH THE ENTIRE PROCESS <3
seen from United States
seen from Poland
seen from Kazakhstan
seen from United States
seen from Brazil

seen from Israel

seen from United States
seen from France
seen from United States

seen from Poland
seen from United States
seen from Germany

seen from United States
seen from Poland

seen from Kazakhstan
seen from South Africa

seen from South Africa
seen from Maldives

seen from Peru

seen from Bangladesh
This interactive flipbook was created with Publuu.com
THE BIG PROCESBOOK. FLIP TROUGH THE ENTIRE PROCESS <3

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
This interactive flipbook was created with Publuu.com
I MADE A DIGITAL BOOKLET WITH THE BEST PICTURES OF THE PHOTOSHOOT. USE THE LINK TO FLIP TROUGH IT :)
WEEK 16 -Â RENDERDAYS
Clo was finally up and running this week so I headed to school every day of the week to render all my animations and fix the last things before the photoshoot planned the 18th. Times are tough, i really have 12 hour days.Â
THINGS DONE IN THESE WEEKS:
FINISHED ALL THE ANIMATIONS
FINISHED BIG TOETIE
FINISHED SMALL TOETIE
FINISHED THE B&E KNIT
THINGS IN NEED TO DO NEXT WEEK:
FINALIZE ALL THE DELIVERABLES, TEASER, PRESENTATION VIDEO, THE PHOTOSHOOT, FABRIC PASSPORT AND MORE SHIZZLE
WEEK 15 - NO CLO3D?!?!??!
This week was quite a stressfull.. So clo shut down and we STILL CAN’T log in. You can make a trial account but for me that is not worth the effort. I need to work at 3/4 computer at the time now. I can’t render on my macbook. When I did that at ATELIER my computer froze/crashed so many times. I need to work on the AMFI computers and the Trial account is linked to your computer. So this week was a HYPERCRAFT week WITHOUT CLO3D. That results in me having to focus on the real life garments. (WHAT WAS PART OF MY PLANNING) but during the stitching I would render some animations. We hope that MONDAY clo is up and running again other wise it’s gonna be hard to make that deadline.. That is prosponed thank god. Really happy that the HYPERCRAFT teachers are this willing to help with everything and also with prosponing the deadline. It wasn’t possible for the orignal date anymore.
THINGS DONE IN THESE WEEKS:
MADE THE KIDDIE POOL ADJUSTABLE PANTS
MADE THE MONSTER BUCKET HAT
MADE THE SHIRT DRESS (90%)
WORKED ON TOETIE BIG
LOCKED THE PATTERNS FOR A SMALL TOETIE (ON TOP OF BUCKETHAT)
MADE THE SPENCER (SIDE AND SHOULDER SEAMS)
FINISHED THE COLLAR ON THE SPENCER
KNITTED NEW BERT AND ERNIE FRONT PANEL SAMPLE.
THINGS IN NEED TO DO NEXT WEEK:
I pray that clo is up and running next week. Next week will be my DIGITAL INHAALSLAG. REnder all my animations that I still need to make and render pictures for the fabric passport. AND make 1/2 looks perfect with seams and finishings in CLO. I kinda forgot about that. I didn’t think it was that important for me since I use CLO as a digital workspace instead of a final stage. I produce on clo so I don’t need to TOILE full pieces, and experiment without any waste. BUt ineke reminded me that the detail like biastape in real life should also be in the digital looks. Maybe not all, but at least one
WEEK 13/14 -Â CHRISTMAS
During christmas Holiday I made the entire digital line up! Super glad I got this done. T-POSE ready!
THINGS DONE IN THESE WEEKS:
DIGITAL MOTHERFUCKING LINE UP
THINGS IN NEED TO DO NEXT WEEK:
I have not done anything physical while I planned on doing this. But I also had to take some days for myself. It’s vacation never the less. So I pushed all the physical things to when school opens again next week. I will first set up 3 computers with each their own animation render and after that I will go an construct something. EVERY DAY the coming next week. Hopefully am able to create all the garments next week. I got all the elements for the Pants, the spencer and BIG toetie. I have to work with hannelore on the B&E KNIT sweat. and make the shirt dress.. AND THE ANIMATIONS AND THE VIDEO AND THERE IS STILL SO MUCH TO DO!! DON’T FORGET FABRIC PASSPORT AND HYPER TECHPACK!! STRESSS

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
This interactive flipbook was created with Publuu.com
During the christmasbrake I worked on making the DIGITAL LINE UP DONE! watch the full process!
ALL THE DIGITAL LOOKS ARE DONE <3.
It took me all christmas brake but I finally got all the looks “T-POSE” Ready. After the brake I will make the animations at school and during the render of those animations work on the other 2 looks I still have to make in real life.
This interactive flipbook was created with Publuu.com
WEEK 12 OF THE DIGITAL PROCESSBOOKÂ