Tools required to install the modular vault room: forklift, electric welder, hammer, crowbar, grinder, lifting ring, wire rope, level, tape measure, etc. 1. Use a forklift to unload and transport the warehouse wall to the installation area, and remove the packaging 2. Use a tape measure and a marker to draw the installation position on the ground, measure the ground level, and then start to install the modular vault room floor 3. Put the level ruler on the floor of the modular vault room, level
How to install a modular vault room? The process of installing the vault panel













