Air vacuum digging is desired in applications where the soil tends to be loose, and water is not readily available. Where immediate backfill of the hole is required, transportation companies, power plants, and other utility companies prefer air vacuum excavation. Due to its lower operating pressure requirement, air vacuum excavation is also preferred around buried electrical lines or brittle utilities.
Air vacuum digging is desired in applications where the soil tends to be loose, and water is not readily available. Where immediate backfill of the hole is required, transportation companies, power plants, and other utility companies prefer air vacuum excavation. Due to its lower operating pressure requirement, air vacuum excavation is also preferred around buried electrical lines or brittle utilities.