Set design day 15
Today we recapped the design process and theatre layouts so that Jess could catch up, then we split into two groups my group had to go through each scene in the first act and plan how the set would look/be laid out. The other group did the second act, tomorrow we will swap and each do a plan for the other act.
The main ideas of the day were to cut out two large windows in the infinity curve walls and cover them with scrim, scrim is a fabric which is opaque when lit from the front and transparent when lit from behind.
we are also going to have two (possibly three) trucks, with flats attached to them, these can be wheeled around and positioned to make different settings.








