State of NC Fast Charging: Winter 2021
It is that time of year where I look back on the growth of the open-charging network in North Carolina (this report does not cover brand exclusive infrastructure such as Rivian, Porsche, and Tesla). There are some changes this year, first and foremost, I am now an employee with ChargePoint Holdings, Inc. I do not have any insider knowledge regarding ChargePoint deployments in the state despite my employment with the company. All information relayed within is information gleaned from public sources or one-on-one conversations with the parties involved with the deployment. With that said, what has changed since the Winter 2020 report? Let’s find out!
Greenlots
Last I reported, QwickCharge out of Atlanta bought these old Greenlots assets and intended to slap a credit card reader on them and get them back in operation. To date, nothing has happened at any of these locations:
The Biltmore Ave Parking Deck
The Asheville Public Works station
Charlotte’s  AAA South End
Charlotte’s AAA on Flat River Dr.
Cherokee
Waynesville (personally tried to use this unit, while powered up it will not start a CCS session due to a proximity error)
Dallas
Salisbury
Matthews
Wadesboro
Greensboro
Hillsborough
Durham
Chapel Hill
Leland
Calabash
The only active Greenlots machines that I can find are all Level 2 systems, however, Duke Energy’s Plug&Charge pilot will use Greenlots as their management backend (the only site currently open is just over the border in SC at South of the Border). It’s entirely possible that in next year’s report there will be some Greenlots stations to report.
ChargePoint
ChargePoint’s footprint continues to grow the North Carolina Electric Member Cooperative’s Electric Vehicle Network using funds from the VW Diesel Emission Mitigation funding plan. The complete list of online locations:
2020 Machines Online: 18
2021 Machines Online: 34 (change: +16)
Machines to be built in 2022: 7
Raleigh: Land Rover, 24kW (KEYWATT)
Durham: BMW, 24kW (KEYWATT)
Greensboro: Land Rover, 24kW (KEYWATT)
Concord: Speedway Harley-Davidson, 24kW (KEYWATT)
Raleigh: Tobacco Road Harley-Davidson, 24kW (KEYWATT)
Fayetteville: Fort Bragg Harley-Davidson, 24kW (KEYWATT)
Shallotte: Beach House Harley-Davidson, 24kW (KEYWATT)
Wallace: Bad Boar Restaurent, 50kW (CPE250)
Lenoir: Blue Ridge Energy District Office, 50kW (Tritium)
Moncure: Jordan Damn Mini Mart, 50kW (CPE250)
Avon: Pangea Tavern, 50kW (CPE250)
Dobson: Circle K, 50kW (CPE250)
Huntersville: BP, 50kW (CPE250)
Asheboro: McDonalds, 50kW (CPE250)
High Point: Riding High Harley-Davidson, 24kW (KEYWATT)
Evergreen: Sun-Do Kwik Stop, 50kW (CPE250)
Enfield: Shell, 50kW (CPE250)
Boone: Blue Ridge Energy, 62.5kW (CPE250)
Statesville: The Greenbrier Grill/Banner Drug, 62.5kW (CPE250)
Mocksville: Mcdonalds, 62.5kW (CPE250)
Marshville: Town of Marshville Public Parking, 62.5kW (CPE250)
Elizabeth City: McDonalds, Â 62.5kW (CPE250)
Tarboro: Edgecomb EMC, Â 62.5kW (CPE250)
Wilson: Chick-Fil-A, Â 125kW/62.5kW (2x Powershared CPE250)
Mebane: Arby’s,  62.5kW (CPE250)
Carrboro: Carrboro Plaza, Â 62.5kW (CPE250)
Halifax, 125kW/62.5kW (2x Powershared CPE250)
Hope Mills: Dirtbag Ales/Dirty Whiskey, Â 62.5kW (CPE250)
Lake Gaston: Lake Gaston Pit Stop, Â 62.5kW (CPE250)
Graham: Â PART Park & Ride, 50kW (CPE250)
Lexington: Lexington Parkway Plaza 62.5kW (CPE250)
Lilesville (formerly Wadesboro): Pee Dee Electric, 62.5kW (CPE250)
Locations that should be open by Winter 2022 report:
Waynesville: Unknown
Morganton 1: Unknown
Morganton 2: Unknown
Siler City: in the ground, not yet activated
Kinston: Unknown Status
New Bern: in the ground, not yet activated  125kW/62.5kW (2x Powershared CPE250)
Wilmington: Unknown
It is safe to assume that all new locations will either be a single 62.kW CPE250 or a pair of power-shared CPE250s that can provide up to 125kW to a single vehicle. ChargePoint now has two, and hopefully soon three, locations that have redundancy (meaning 2 or more stations at the location).
EVgo
EVgo has expanded their footprint and improved reliability in 2021:
2020 Machines Online: 23
2021 Machines Online: 30 (change: +7)
Machines to be built in 2022: 0
Asheville outlet mall (2) 50kW
Asheville Biltmore Park 50kW
Charlotte Ballantyne Commons Pkwy BP 50kW
Charlotte Walker Branch Road BP Â 50kW
Charlotte Steele Creek Rd BP Â 50kW
Charlotte Mt Holly-Huntersville Rd BP Â 50kW
Charlotte Vinnie’s Way BP  50kW
Charlotte Cambridge Commons Dr BP Â 50kW
Charlotte The Shoppes at Highland Creek  50kW
Charlotte Thomas Ave Public Lot  50kW
Charlotte SouthPark Mall  50kW
Mooresville BP Â 50kW
Durham at The Hyatt  50kW
Durham South Square Mall  50kW
Cary Sheetz  50kW
Morrisville Sheetz  50kW
Raleigh Marriott  50kW
Raleigh Airport Sheetz  50kW
Raleigh AAA New Hope Rd  50kW
Wake Forest has one at the AAA Â 50kW
Mint Hill at Earp’s Express  50kW
Matthews BP Â 50kW
Charlotte Carmel Commons 2x 100kW and 1x 350kW (dual CCS no CHAdeMO)
Greensboro Lowe’s Foods Jamestown 2x 100kW
Raleigh Lowe’s Foods Brier Creek 2x 100kW
EVgo listed Harrisburg as the award site under the Phase 1 VW Settlement funds, but it appears they built in South Charlotte instead. At least all three locations are online! EVgo’s new sites are all minimum 2 dispensers at twice the power level of their existing network footprint.
Electrify America
2020 Machines Online: 54
2021 Machines Online: 58 (change: +4)
Machines to be built in 2022: 0
Electrify America is the largest operator by a wide margin now: 58 dispensers across 12 sites. They’re no longer the only company with a redundant design - meaning more than one dispenser and more than one cable per machine. The open locations:
Raleigh: 6 (BTCPower)
Wake Forest: 3 (Signet)
Rocky Mount: 4 (Signet)
Henderson: 4 (Signet)
Greensboro: 8 (Signet)
Charlotte: 10 (ABB)
Asheville: 4 (Signet)
Hillsborough: 4 (ABB)
Cary: 3 (Signet)
Smithfield: 4 (Signet)
Lumberton: 4 (Signet)
Statesville: 4 (Signet)
Interstate Highway Coverage: I-95
Interstate 95 now has 7 DC fast charging locations with 18 dispensers. Starting at the North Carolina Welcome center:
13.6mi: Halifax, 2x ChargePoint 62.5kW to 125kW
7.4mi: Enfield, 1x ChargePoint 50kW
25.7mi: Rocky Mount, Electrify America 2x 150kW and 2x 350kW
18.8mi: Wilson, Â 2x ChargePoint 62.5kW to 125kW
27.3mi: Smithfield, Electrify America 2x 150kW and 2x 350kW
55.7mi: Hope Mills, 1x ChargePoint 62.5kW
21.1: Lumberton, Electrify America 2x 150kW and 2x 350kW
27.5: South of the Boarder, 2x 150kW Duke Plug & Charge
The single longest stretch between chargers is Smithfield and Hope Mills. If a single charger were to be installed between these locations, I-95 would qualify for Alternative Fuel Corridor signage from the Federal Government. I-95 needs to have billboard signage to promote these charging locations, this is a project I’ve been trying to engage Plug-in NC and The NC Clean Energy Technology Center into funding.
Interstate Highway Coverage: I-85
Interstate 85 now has 7 DC fast charging locations with 29 dispensers. Starting at the VA State Line:
29.7mi: Henderson, Electrify America 2x 150kW and 2x 350kW
48.2mi: Hillsborough, Electrify America 2x 150kW and 2x 250kW
11.6mi: Mebane, 1x ChargePoint 62.5kW
9.0mi: Graham, 1x ChargePoint 50kW
25.9mi: Greensboro, Electrify America 6x 150kW and 2x 350kW
33.9mi: Lexington, 1x ChargePoint 62.5kW
50.9mi: Charlotte, Electrify America 8x 150kW and 2x 350kW
44.3mi: SC Border
Interstate 85 technically qualifies for Alternative Fuel Corridor signage, being that 50.9 miles is the single longest stretch between charging stations. This doesn’t denote non-networked/dealership charging stations or any charging station below 50kW.
Interstate Highway Coverage: I-40
Interstate 40 now has 13 DC fast charging locations with 29 dispensers. Starting at the TN border:
41.1mi: Asheville, Electrify America 2x 150kW and 2x 350kW
6.7mi: Asheville, EVgo 2x 50kW
108mi: Statesville, Electrify America 2x 150kW and 2x 350kW
4mi: Statesville, ChargePoint 62.5kW
16.9mi: Mocksville, ChargePoint 62.5kW
45.1mi: Greensboro, EVgo 2x 100kW
11.4mi: Greensboro, Electrify America 4x 150kW 2x 350kW
26.8mi: Graham, ChargePoint 62.5kW
8.6mi: Mebane, ChargePoint 62.5kW
25.4mi: Durham, EVgo 50kW
11.4mi: Morrisville, EVgo 50kW
7.1mi: Raleigh, EVgo 50kW
3.9mi: Cary, Electrify America 3x 150kW
94.2mi: Wallace, ChargePoint 50kW
39.8mi: Wilmington (pending DC Fast charger)
Interstate 40 needs a lot of work! The 108-mile (106 if you go from Electrify America Asheville to Electrify America Statesville) stretch between Asheville and Statesville, and the stretch from Cary to Wallace need immediate attention. This corridor also has a lot of locations with a single charger, which is not sufficient for the number of EVs that Gov. Cooper is calling for (1.25M by 2030). There you have it folks! That’s the NC State of Charge for 2021! I’ll do the 2022 in a year - so stay tuned!