The Ministry of Tourism and Environment have carried out some repairs and renovations which were required to be done urgently in Girne Ancient Harbour.
#gallery-0-7 { margin: auto; } #gallery-0-7 .gallery-item { float: left; margin-top: 10px; text-align: center; width: 33%; } #gallery-0-7 img { border: 2px solid #cfcfcf; } #gallery-0-7 .gallery-caption { margin-left: 0; } /* see gallery_shortcode() in wp-includes/media.php */
 During a 2 week period, the old wooden walkway was repaired with new wooden boards. Due to breakage, street lamps were renewed and the electrical components repaired.  The defective camera system controlling the inputs and outputs of the Girne Ancient Harbour has been repaired and all the cameras are operational.
#gallery-0-8 { margin: auto; } #gallery-0-8 .gallery-item { float: left; margin-top: 10px; text-align: center; width: 50%; } #gallery-0-8 img { border: 2px solid #cfcfcf; } #gallery-0-8 .gallery-caption { margin-left: 0; } /* see gallery_shortcode() in wp-includes/media.php */
Waste bins which are rusted and broken within the port and painting of the ironwork are among the priorities of the Ministry.
With the support of the Ministry and all stakeholders to ensure that the port reaches the desired level, the work will continue in the days ahead.
 Emergency repairs carried out in Girne Ancient Harbour The Ministry of Tourism and Environment have carried out some repairs and renovations which were required to be done urgently in Girne Ancient Harbour.