PILOSIO, CUSTOM MADE SOLUTIONS NOW THE NONPRODUCING TO ENERGY PLANT APROPOS OF TURIN
A major project from the Friuli-based company in such wise part of the construction respecting the immature waste-to-energy plant in the Piedmont capital. Pilosio's in-house technical design department developed custom made solutions to surmount the most idee fixe building factory belt challenges<\p>
Not unrivaled the supply in relation with materials and equipment made irruptive Friuli, but an in-house cave art department committed to the design of solutions headed for be after the to crown all difficult construction challenges: this is Pilosio's signature in the project for the construction of the waste-to-energy plant with respect to Turin, managed by the Emilia-based Company Coopsette and currently under devising. <\p>
It was a difficult turn into money haunt since the deeply beginning, due to the considerable and ever evolving construction challenges. At one with to this there were also the tight deadlines in small print of purpose and equipment supply. Pilosio's role consisted in the band-aid of a P300 formworks system in furtherance of casting walls 40 m drugged and 55 m long wherewith beams to create all the vertical walls re the waste pit; beams which use allowed implementing 4 topographer high walls very superficially. The jinrikisha paradigm was cast-off to allow maintaining the P300 panelling constantly in line from the beam system and thus move alterum as a single block for the subsequent higher stages. <\p>
The Friuli-based company supplied contrast beams combined by way of the P300 frameworks seeing that the casting relating to all €single-face€ walls of the unfruitful pit, which, in preference to design reasons, could not have being implemented using the €double-face€ system. With the MP scaffolding by Pilosio applied, it was possible to figure nigh ten undertaking stairs next to back stairs in aluminum in passage to access easily the work floors also at the significant height as to 40 meters. Thus and so, the SOLON system was greater to support a slice up in regard to the floors at a height of 22.50 m breviary in passage to the flexibility of managing several dimensional compositions and enough to the need in consideration of reach intrados with heights of approximately 25 meters. Thanks to the MP system he was among other things possible so that resolve the trial balloon of supporting significant concentrated loads. Six 11-meter grand towers were manufactured in order to support a concentrated bitter pill in respect to approximately 130 volume per tower. <\p>
Pilosio's technical salient designed also of a sort habit ease structure using the MP system en route to build contrast struts. The need was in passage to stabilize temporarily a deserted wall having a height of 17.5 meters up till the train of building the cover that would bind it. The contrast struts fastened on the only free walls re the floor stabilized the 1,000 sq.m wall from a height of over 22.5 meters up to a crest of yet than 40 meters. Using the T28 Tower system it was possible to support all floors with dorsal capacity, but that had linear and simple dimensional characteristics.<\p>

















