The sooner the problem is anticipated, the greater your savings...
Performing Clash Detection and RFI resolution tasks before/during reconstruction
Engineering design is a dynamic field that requires effective coordination between several stakeholders for desired results. In the current era, any construction design project involves several stakeholders, such as structural engineers, architects, contractors, suppliers, and vendors, sometimes making the project completion process highly complex.
On top of it, the whole building design and construction ecosystem are facing the challenge of timely completion of projects. In such a scenario, accuracy and precision are critical elements during the design phase.
Clash detection is a critical part of the integrated BIM modeling process. BIM modeling involves creating a comprehensive master model that includes design models from different disciplines of engineering design. Autodesk Navisworks is the best BIM-adopted software in the market useful for Clash Detection and Clash Report Generation.
Clash detection via Building Information Modeling (BIM) helps in speeding up projects by identifying clashes between several models during the design stage itself, helping architects and contractors eliminate chances of multi-level design changes which can result in budget overshoot and delay in project completion time.