When the timeline drops by 100 days, we step up! 🚀🏢
The TVC Tower was a massive undertaking-66,000 Sq. M. of Architectural, Structural, and MEP modeling at LOD 350.
The Twist: Midway through, the deadline was pulled forward, cutting our time from 300 days down to 200 days. ⏳
How we handled it:
🔹 Rapidly scaled up our BIM team.
🔹 Solved major clashes with proactive design changes.
🔹 Delivered full installation drawings on the new schedule.
Great projects aren't just about software; they're about the team behind the screen. 💻✨
🔗 Full story! https://www.teslacad.ca/case-study/tvc-tower.php

















