PEX tubing Mesh reinforcement. Rails
http://www.warmfloorcenter.com/pex-tubing.html http://www.tms-nc.com/pex-tubing/pex-tubing-design http://www.heatlinkusa.com/pex-tubing-pex-plumbing-tools-in-plumbing-with-pex-tubing.html Reinforcement mesh step of the cell and the diameter of rod reinforcing mesh is chosen on the basis of the floor construction, based on the features of a premise (building), its destination, loads, etc. In standard designs for ease of installation used a grid, usually with a cell 150x150 mm, rods 4-5 mm. Placed on a PEX tubing, is underlying basis for the layout of circuits of water underfloor heating. Pipe attached to mesh with plastic clamps.   To give extra strength screed in some cases is double reinforcement: a second layer of reinforcing mesh is placed on the contours of the water pipe underfloor heating. Rails in Europe because of the large spread of the type stacking "snake" is widely used mounting rails and clips, which are displayed on PEX tubing.   Sometimes to fix the reinforcing mesh and / or mounting rails used plastic U-shaped anchors.   Tube circuits vschelkivaetsya mounting rails in the slots (clips). In this case, apply one layer of reinforcement placed on top of pipes. Damping Tape   A damping tape is placed around the perimeter of the premises prior to pouring concrete. Serves as a compensator of thermal expansion of concrete ties when heated. Is made, usually of polyethylene foam width of 100-120 mm and a thickness of 8-10 mm. Pipes   Tube circuits Radiant floor laid in accordance with the drawing (draft water floor heating). Number of meters of pipe is documented and recorded in a table balancing reservoir, attached to the project. Evidence-based installation engineers decided on the need to adjust the adjustment (balancing) of the table. As a rule, unlike the actual length of pipe from the project by up to 10%, the correction of balancing the collector is not required.















