2 weeks of chasing lines and the lofting is done.....we still have a bunch of construction drawings to to but it is soo nice to have boat shapes....next up cutting molds

izzy's playlists!
🪼

ellievsbear

pixel skylines
Peter Solarz
Show & Tell

#extradirty
KIROKAZE
I'd rather be in outer space 🛸
he wasn't even looking at me and he found me
sheepfilms
i don't do bad sauce passes
Three Goblin Art
trying on a metaphor

★
Today's Document
Game of Thrones Daily

Love Begins
YOU ARE THE REASON

seen from Türkiye

seen from Taiwan

seen from United States

seen from Maldives

seen from Belarus

seen from Türkiye

seen from Israel
seen from United Kingdom
seen from United Kingdom
seen from Hong Kong SAR China

seen from United States
seen from United States

seen from France

seen from Israel
seen from Brazil
seen from United States

seen from United States

seen from Italy
seen from United States
seen from United States
@herreshoff1093
2 weeks of chasing lines and the lofting is done.....we still have a bunch of construction drawings to to but it is soo nice to have boat shapes....next up cutting molds

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
Lofting is a dark art, for us it starts with translating scans of the hand written table of offsets written by NGH in 1928. For the most part this isn’t too hard, any anything that looks “off” we can fair in when we draw it. HOWEVER, the transom page is nearly illegible and the voodoo that they do isn’t giving us a curve that is even remotely fair. Thankfully the boat is readable so we will be pulling the lines tomorrow morning
So this years projects at IYRS are a pair of Herreshoffs; 330p, a launch, and 1093 a Colonia Lifeboat (the only known survivor of 30 made). Right now we are lofting and preparing the work surface. I got to build the platforms, layout the grid (stations and centerline) level the strong back (-1/16” off over 17’), build an extension to support the transom, and bring the bring the grid up to the top of the strong back. Finally got to use my trammels and my new planking compass. Once we finish the lofting the molds will be installed on the strong back, just adding a layer of stability to the build process as well as more separation from the heated floor.