For the St. Andrews building project in the UK, the goal wasn't just 3D visualization—it was construction readiness. We delivered a robust, end-to-end BIM solution for this 8-story commercial hub to drive precise MEP installations.
🛠️ What we delivered: Full Multi-Disciplinary Modelling: Architectural, Structural, and MEP derived from PDF/CAD.
Clash Resolution: Comprehensive Navisworks reports to kill conflicts before fabrication.
Installation Drawings: Precise shop drawings extracted directly for the field crews.
The Result: A model that translates perfectly from the screen to the job site. 🚀
đź”— Read the full Case Study: https://www.teslacad.co.uk/blog/casestudies/architectural-structural-mep-bim-model-for-st-andrews-building-along-with-clash-resolution-in-uk/
















