Put in one 6 inch main with 3 laterals in the last waterway. Then we shaped the waterways and leveled off the tile lines. Finally finished at this job site, and now we get to move all of the equipment home and then to the next place. #field #drainage #tile #installation #drainagetile #fieldtile #finallyfriday #tileinstallation #bulldozer #excavator #lovewhatido (at Iowa) https://www.instagram.com/p/B_8lImLF9xX/?igshid=184rmra0mckwg










