Doosan
seen from Italy
seen from Russia
seen from Portugal
seen from South Korea

seen from United States

seen from Malaysia

seen from Malaysia
seen from United States
seen from United States

seen from United States

seen from United States

seen from United States
seen from Türkiye
seen from United Kingdom
seen from Türkiye

seen from United Kingdom
seen from China

seen from United States
seen from United States

seen from Bangladesh
Doosan

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
Selling heavy equipment doesn't have to be complicated. Equipment Buyers USA provides professional evaluations and competitive offers for used construction machinery. Get started today and see how easy it is to sell your equipment.
📞 Call: 972-469-5703 🌐 https://www.equipmentbuyersusa.com/
Looking for a reliable buyer for your used construction equipment? Equipment Buyers USA purchases equipment in all conditions, from single machines to entire fleets. Turn unused assets into cash without the stress of listing, advertising, or negotiating with multiple buyers.
📞 972-469-5703 🌐 https://www.equipmentbuyersusa.com/
Since 1954, Equipment Buyers USA has been helping equipment owners sell heavy machinery with confidence.
From one machine to an entire fleet, we're interested.
📞 972-469-5703 🌐 equipmentbuyersusa.com
Doosan DA30 Dump Truck engine assembly -Removal
七月 04, 2024
This article introduces doosan DA30 Dump Truck engine assembly -Removal
Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
Place the dump truck on level ground and apply parking brake. Apply articulation lock. Turn off main switch in battery case. Raise the dump body and lock it with the safety support. Raise the tiltable cab and lock it with the safety support. Remove bonnet. Drain engine coolant. Look in OPERATION & MAINTENANCE MANUAL chapter 2 for instructions.
WARNING: Never turn off battery main switch when engine is running Never turn off battery mainSwitch when ignition is on Leave battery main switch on for atleast 3 minutes before engine has stopped
DANGER:lace wheel chocks to the front wheel
Take away the cab bolt, left and right hand side. M46 mm Bolt torque: 277Nm
Turn the direction valve on the pump in lifting up position. With the handle, pump and raise the cab
Left side: 1. Disassemble the cab pump unit from the air filter stand. 2. Remove the water hose from the pipe socket. 3. Remove the fuel hoses (3 pcs) and 4. Disassemble hydraulic hoses
Disasssemble the cable to the Air filter sensor and cable to the sensor for the cooling water expansion tank. The unit will have two sensors on T4i/stage 3B (black arrows). Doosan Machine Engine Diagnostic Software Package 2024 One PC Installation
Slack the transmission belt. Detach the Air Cond. compressor with the hoses on, from the engine. Check that all of the clamps are undone. Place the Air condition compressor on the left side while the en gine is dismounted.
Disconnect the hose from the termostat housing and the pipe between the air cooler and engine air inlet. Disconnect bracket for the air pipe and bracket between engine and fan bracket
Disconnect the outlet pipe bend from turbo, and the inlet water hose from the transmission cooler.
Disconnect the retur hose. (Engine - expansion tank) (Quick release coupling) (Front of the engine, view from the right hand side)
Disconnect the urea venting filter
Disconnect the cables between starter motor and the frame
Disassemble grounding cable attached to bracket underneath the engine starter. 2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
Disconnect contact on the dynamo.
Remove the cover and disconnect the electrical contact from the engine ECU -S6 control unit Unwind wires from engine to frame
Front- Left and right hand side, disassemble screw on the engine mounting bracket. Assembly torque: 560 Nm (M20 10.9)
Remove clamps and dissasemble hoses connected to hydraulic block (red arrows) 1 2 Drive shaft Remove safety archer. Remove driveshaft between transmission and engine coupling, 1 Assembly torque: 114 Nm 2 Assembly torque: 141 Nm 3 Assembly torque: 141 Nm Disassemble front brake oil cooler hose from the brake cooler circulate pump.

Anya is live and ready to show you everything. Watch her strip, dance, and perform exclusive shows just for you. Interact in real-time and make your fantasies come true.
Free to watch • No registration required • HD streaming
Doosan DL350-5 Loader Engine Hydraulic Control Unit Disassembly
五月 28, 2024
this article introduces the disassembly of Doosan DL350-5 loader Engine HYDRAULIC CONTROL UNIT Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality NOTE: Check all components for damage and replaceif necessary. Before installation, check free travel of all moving parts in housing. Spools can be exchanged individually. Oil components before reassembly according to ZF list of lubricants TE-ML 03. Insert diaphragms with concave side facing upward until contact is obtained. NOTE: Installation position, see arrows.
2, Install components according to Figure 90. NOTE: Preload compression spring of the follow onslides and locate spool provisionally using cylindrical pins 05.0 mm (0.1969 in)(assembly aid), See Figure 91.
3. Install two adjusting screws. 4. Assemble gasket (1, Figure 92) and housing cover (Figure 92). Position housing cover uniformly, using adjusting screws, until contact is obtained and remove cylindrical pins (assembly aid) again(Figure 93). NOTE: Pay attention to different housing covers. NOTE: Install recess 015.0 mm(0.5906 in)(2, Figure 92), facing spring ofpressure reducing valve. (S) Adjusting screws -5870204036
5 Fasten housing cover using socket head screws. NOTE : Torque limit 0.56 kg-m(4 ft Ib). (S) Box spanner (Torx TX-27)-5873042002
6. Install pressure regulators and secure using fixing plates asasc. NOTE: Install fixing plate, with claw facing downward. Pay attention to radial installation position of pressure regulators, see Figure 95. NOTE: Torque limit 0.56 kg-m (4 ft Ib). (S) Box spanner (Torx TX-27)-5873042002
B.I nstall components according to Figure 96.
C. Preload compression springs of the follow on slidesand locatespool provisionally using cylindrical pins O 5mm(0.1969 in)(assembly aid). See arrows. D. Install two adjusting screws. E. Assemble gasket(1, Figure 97) and housing cover, and position them uniformly against shoulder, using adjusting screws. NOTE: Pay attention to different housing covers, install the recess 019mm(0.7480 in)(2, Figure 97), facing the main pressure valve. F. Fasten housing cover using socket head screws. NOTE: Torque limit 0.56 kg-m (4 ft lb). G. Remove cylindrical pins (assembly aid) again. (S) Adjusting screws -5870204036 (S) Box spanner (Torx TX-27)-5873042002 H. Install pressure regulators and secure using fixing plates and socket head screws.
2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software NOTE: Install fixing plates, with claw facing downward. Pay attention to radial installation position of pressure regulators, see Figure 98. NOTE: Torque limit 0.56 kg-m (4 ft lb). (S) Box spanner (Torx TX-27)-5873042002 I. Introduce cable harness and connect pressure regulators (6x). NOTE: Pay attention to installation position of cable harness, see also markings (Figure 79).
J. Introduce female connector against shoulder, with groove facing guide nose of cover. K. Install gaskets(Figure 100) and fasten cover using s . NOTE: Torque limit 0.56 kg-m (4 ft Ib). (S) Box spanner (Torx TX-27)-5873042002
L. Secure female connector using retaining clamp, see Figure 101. M. Install opposite cover.
N. Install two adjusting screws and mount gasket I. NOTE: Pay attention to different gaskets, see Figure 102 and Figure 105. (S) Adjusting screws -5870204063
8. Intermediate plate-version with screens: A. Insert screens(6x) flash -mounted into bore of intermediate plate, see Figure 103. NOTE: Pay attention to installation position-screens are facing upward (facing duct plate).
B. Mount intermediate plate, with screens with screens facingupward.
C. Mount gasket II.
D. Mount duct plate and fasten it uniformly using socket head screws. NOTE: Torque limit 0.97 kg-m (7 ft Ib). (S) Box spanner (Torx TX-27)-5873042002 E. Equip screw plugs (8x) with new O-rings and install them. NOTE: Torque limit 0.61 kg-m (4 ft Ib). NOTE: The installation of hydraulic control unit is described in following section,"Mount Duct Plate and Hydraulic Control Unit"on page-142.
E. Equip screw plugs (8x) with new O-rings and install them. NOTE: Torque limit 0.61 kg-m (4 ft lb). NOTE: The installation of hydraulic control unit is described in following section,"Mount Duct Plate and Hydraulic Control Unit"on page-142.
Doosan Machine Engine Diagnostic Software Package 2024 One PC Installation
Doosan DX350LC hydraulic Excavator hydraulic comtrol unit disassembly Instructions
this article describesDoosan DX350LC hydraulic Excavator HYDRAULIC CONTROL UNIT Disassembly Instructions
2020 Doosan Daewoo Excavator Operation and Repair Manual PDF
IMPORTANT
Different versions in relation to the position of the cable harness are possible.
In this connection,pay attention to the Specifications of the Vehicle Manufacturer.
1. Figure 78,shows complete control unit.
2. Mark the installation position of different covers,the
thousing and the cable harness with the valve housing.
3. Loosen socket head screws.
4. Separate duct plate,1st gasket,intermediate plate and 2nd gasket from the valve housing.
(S)Box spanner (Torx TX-27)-5873042002 Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
5. Remove retaining clip.
6. Loosen socket head screws.
7. Separate cover from housing and cable harness. (S)Box spanner (Torx TX-27)-5873042002
8. Disassemble opposite cover.
9. Disconnect pressure regulator and remove cable hamess.
10.Loosen socket head screws,remove fixing plate and pressure regulators (3x).
(S)Box spanner (Torx TX-27)-5873042002
11. Loosen two socket head screws and locate housing provisionally,using adjusting screws.(Housing is spring loaded).Then loosen remaining socket and screws.
(S)Box spanner (Torx TX -27)-5873042002
(S)Adjusting screws -5870204036
12.Separate housing from valve housing by loosening adjusting screws uniformly.
(S)Adjusting screws -5870204036
13.Remove components(Figure 87).
14. Remove opposite pressure regulators,housing and components accordingly (Figure 88).
2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
Doosan DX340LC hydraulic Excavator Anti-swing Gear Disassembly Instructions
This article describes the Doosan DX340LC hydraulic excavator anti-sway gear removal instructions Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
REMOVAL 1. Park on firm and level ground. 2. Lower front attachment (bucket) to ground. 3. Shut down engine. 4. Set safety lever on "RELEASED" position. 5. Turn starter switch to "I" (ON) position. 2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
WARNING! If engine must be running while performing maintenance, always use extreme caution. Always have one person in cab at all times. Never leave cab with engine running. 6. Fully stroke work levers (joysticks) in all directions to relieve any pressure from accumulators. 7. Set safety lever on "LOCK" position. 8. Turn key to "O" (OFF) position and remove from starter switch. 9. Hang a maintenance warning tag on controls. 10. Disconnect negative (-) battery cable leading to frame from battery. 11. Tag and disconnect hoses from swing motor (1, Figure 3). Plug and cap hoses and ports to prevent contamination from entering hydraulic system or component. 12. Disconnect tube (2) from drain cock (3) and hose fitting (7) from fill hole. 13. Remove twelve bolts and washers (4, Figure 3) holding swing reduction gearbox (5) to frame. 14. Using a suitable lifting device, slingswing motor (1, Figure3) and remove swing motor and reduction gearbox (5) as an assembly from unit.
2020 Doosan Daewoo Excavator Operation and Repair Manual PDF
NOTE: A drain cock (3, Figure 3) and tube are on side of gearbox. Be careful not to damage valve or tube.
NOTE: There are two alignment pins (6, Figure 3), one on each side of reduction gearbox flange